Small/Veteran/Disadvantaged Business Enterprise (SVDBE) Goal

Where subcontracting opportunities exist, a Small, Veteran, and Disadvantaged Business Enterprise (SVDBE) Goal is specified on capital contracts funded through the Georgia Transportation Act of 2015. A portion of the project goal, not greater than 50% of the specified Goal, may be achieved through the use of Small and/or Veteran owned businesses. The entire goal may be met through the use of GDOT approved DBEs.

SVDBE FACT SHEET

GDOT PROJECTS WITH SVDBE GOALS

Instructions for locating projects with SVDBE Goals:

1. Go to the desired letting: www.bidx.com/ga/lettings

2. Log into Bid Express, or establish a free account with Bid Express | Info Tech

3. Identify proposals with the prefix “B3”

4. Select the desired proposal

5. Once the proposal has been selected, select Proposal under Downloads, and view the corresponding Call #

6. Go to the DBE Goal commitment page to identify the established SVDBE goal

NOTE: The goal will be reflected as “DBE”; however, it is in fact the established SVDBE goal.

2025 Letting SFSP Project List with SVDBE Goals
July 18th, 2025 @ 11am
GDOT Proposal Number DBE Goal Project Description
GDOT Proposal
B3CBA2502298-0
14% Construction of a roundabout on SR 20 at McGarity Rd. and Lawrenceville St.
GDOT Proposal
B3CBA2502512-0
5% 16.120 miles of milling, inlay, and plant mix resurfacing on SR 135 beginning at the Coffee County line and extending to Jefferson St. and beginning north of Smith St. and extending to SR 27.
GDOT Proposal
B3CBA2502428-0
6% 0.426 miles of milling, inlay, and plant mix resurfacing on SR 3 Conn beginning South of SR 3 (Old Dixie Rd.) and extending north of Upper Riverdale Rd. (CR 392).
GDOT Proposal
B3TIA2502387-0
10% 8.443 miles of widening and reconstruction on US 441/SR 89 beginning at Orange St. and extending north of SR 122.
GDOT Proposal
B3CBA2502426-0
4% 6.141 miles of milling, plant mix resurfacing, and shoulder rehabilitation on SR 330 beginning east of SR 82 and extending to SR 15 ALT.
GDOT Proposal
B3CBA2502533-0
6% 5.080 miles of milling and plant mix resurfacing on US 78/SR 140 beginning at I-285/SR 407 and extending to SR 10.
GDOT Proposal
B3CBA2502507-0
5% 14.260 miles of milling and plant mix resurfacing on SR 17 beginning north of Anderson Ave. and extending to the Screven County line.
GDOT Proposal
B3CBA2502406-0
5% 1.339 miles of milling, plant mix resurfacing, and shoulder rehabilitation of SR 77 Conn beginning east of SR 77 and extending north of SR 17/SR 72.
GDOT Proposal
B3CBA2502550-0
5% 2.909 miles of milling, inlay, and plant mix resurfacing on SR 19 beginning at SR 87 and extending to US 41/SR 247 (Pierce Ave.).
GDOT Proposal
B3CBA2502352-0
4% ITS CCTV expansion on I-16/SR 404 at various locations in Bleckley, Candler, Laurens, Treutlen and Twiggs counties.
GDOT Proposal
B3CBA2501345-0
9% 1.724 miles of widening and reconstruction for additional passing lanes on US 301/SR 73 beginning south of Randy Lowery Rd. and extending south of Clito Rd.
GDOT Proposal
B3CBA2502415-0
5% 6.628 miles of milling, inlay, plant mix resurfacing, and shoulder rehabilitation on SR 337 beginning at the Alabama State Line and extending to SR 337 (Old Highway).
GDOT Proposal
B3CBA2502432-0
12% 0.232 miles of widening and reconstruction for additional turn lanes on US 19/SR 3 at SR 138 SPUR.
GDOT Proposal
B3CBA2502516-0
4% 8.117 miles of milling, plant mix resurfacing, and shoulder rehabilitation on SR 79 beginning north of the Broad River Bridge and extending south of SR 72.
GDOT Proposal
B3CBA2502517-0
5% 2.597 miles of milling, inlay, and plant mix resurfacing on US 80/SR 26 beginning west of US 1/ SR 4 and extending west of SR 56 west.
GDOT Proposal
B3CBA2502407-0
4% 0.087 miles of milling, plant mix resurfacing, and shoulder rehabilitation on I-75/SR 401 beginning at the northbound and southbound weigh stations on ramps and off ramps.
GDOT Proposal
B3CBA2502427-0
5% 2.577 miles of milling and plant mix resurfacing on SR 49 beginning east of Randolph St. and extending to SR 90 and on SR 90 beginning north of SR 26 (Walnut St.) and extending to SR 49.
GDOT Proposal
B3CBA2502497-0
5% 16.430 miles of milling, inlay, plant mix resurfacing, and shoulder rehabilitation on SR 26 beginning at the Chattahoochee County Line and extending to the Schley County Line.
GDOT Proposal
B3CBA2502501-0
5% 3.487 miles of milling, plant mix resurfacing, and shoulder rehabilitation on SR 339 beginning east of SR 66 and extending west of SR 17.
GDOT Proposal
B3CBA2502539-0
5% 8.762 miles of milling, plant mix resurfacing, and shoulder rehabilitation on SR 17 beginning at the White County Line and extending to US 76/SR 2.

GDOT PROJECTS WITH SVDBE GOALS

Replace “To access the notice to contractors:
1. Click the link to the GDOT Proposal.
2. Under the Downloads box (lower left corner), select Proposal.” with the info below.

 

Instructions for locating projects with SVDBE Goals: 

1. Go to the desired letting: www.bidx.com/ga/lettings

2. Log into Bid Express, or establish a free account with Bid Express | Info Tech

3. Identify proposals with the prefix “B3”

4. Select the desired proposal

5. Once the proposal has been selected, select Proposal under Downloads, and view the corresponding Call #

6. Go to the DBE Goal commitment page to identify the established SVDBE goal

 

NOTE: The goal will be reflected as “DBE”; however, it is in fact the established SVDBE goal.

 

2021 GDOT Letting – SSFP Project Listing
Proposal # Link to Proposal Eligible Bidders/Planholders Apparent Bids SVDBE Goal Call Order
January 2021
B3CBA2100843-0 https://www.bidx.com/ga/proposal?contid=B3CBA2100843-0 https://www.bidx.com/ga/planholders?contid=B3CBA2100843-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2100843-0 12% 26
February 2021
B3CBA2100985-0 https://www.bidx.com/ga/proposal?contid=B3CBA2100985-0 https://www.bidx.com/ga/planholders?contid=B3CBA2100985-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2100985-0 13% 23
B3CBA2100990-0 https://www.bidx.com/ga/proposal?contid=B3CBA2100990-0 https://www.bidx.com/ga/planholders?contid=B3CBA2100990-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2100990-0 0% 24
B3CBA2100975-0 https://www.bidx.com/ga/proposal?contid=B3CBA2100975-0 https://www.bidx.com/ga/planholders?contid=B3CBA2100975-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2100975-0 14% 25
March 2021
April 2021
B3CBA2101295-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101295-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101295-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101295-0 11% 18
B3CBA2101277-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101277-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101277-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101277-0 8% 19
B3CBA2101268-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101268-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101268-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101268-0 11% 20
May 2021
B3CBA2101592-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101592-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101592-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101592-0 7% 025
B3CBA2101501-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101501-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101501-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101501-0 8% 029
B3CBA2101457-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101457-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101457-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101457-0 10% 030
B3CBA2101563-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101563-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101563-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101563-0 12% 032
B3TIA2101474-0 https://www.bidx.com/ga/proposal?contid=B3TIA2101474-0 https://www.bidx.com/ga/planholders?contid=B3TIA2101474-0 https://www.bidx.com/GADOT/apparentbids/contid/B3TIA2101474-0 10% 033
B3TIA2101550-0 https://www.bidx.com/ga/proposal?contid=B3TIA2101550-0 https://www.bidx.com/ga/planholders?contid=B3TIA2101550-0 https://www.bidx.com/GADOT/apparentbids/contid/B3TIA2101550-0 11% 034
B3CBA2101547-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101547-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101547-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101547-0 6% 036
B3CBA2101478-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101478-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101478-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101478-0 9% 037
June 2021
B3CBA2101802-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101802-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101802-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101802-0 15% 053
B3CBA2101769-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101769-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101769-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101769-0 2% 058
July 2021
B3CBA2101844-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101844-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101844-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101844-0 13% 022
B3CBA2101295-1 https://www.bidx.com/ga/proposal?contid=B3CBA2101295-1 https://www.bidx.com/ga/planholders?contid=B3CBA2101295-1 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101295-1 11% 023
B3CBA2101938-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101938-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101938-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101938-0 15% 024
B3CBA2101939-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101939-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101939-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101939-0 12% 025
B3CBA2101993-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101993-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101993-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101993-0 11% 026
B3CBA2101990-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101990-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101990-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101990-0 11% 027
August 2021- Proposal # | Link to Proposal | SVDBE Goal | Call Order
B3CBA2102084-0 https://www.bidx.com/ga/proposal?contid=B3CBA2102084-0 https://www.bidx.com/ga/planholders?contid=B3CBA2102084-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2102084-0 9% 019
B3CBA2101559-1 https://www.bidx.com/ga/proposal?contid=B3CBA2101559-1 https://www.bidx.com/ga/planholders?contid=B3CBA2101559-1 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101559-1 9% 020
B3CBA2102066-0 https://www.bidx.com/ga/proposal?contid=B3CBA2102066-0 https://www.bidx.com/ga/planholders?contid=B3CBA2102066-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2102066-0 17% 021
B3CBA2101985-0 https://www.bidx.com/ga/proposal?contid=B3CBA2101985-0 https://www.bidx.com/ga/planholders?contid=B3CBA2101985-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101985-0 11% 022
October 2021
B3CBA2102082-0 https://www.bidx.com/ga/proposal?contid=B3CBA2102082-0 https://www.bidx.com/ga/planholders?contid=B3CBA2102082-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2102082-0 11% 16
November 2021
B3CBA2101985-1 https://www.bidx.com/ga/proposal?contid=B3CBA2101985-1 https://www.bidx.com/ga/planholders?contid=B3CBA2101985-1 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101985-1 11% 13
December 2021
B3CBA2102192-0 https://www.bidx.com/ga/proposal?contid=B3CBA2102192-0 https://www.bidx.com/ga/planholders?contid=B3CBA2102192-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2102192-0 8% 19
B3CBA2102167-0 https://www.bidx.com/ga/proposal?contid=B3CBA2102167-0 https://www.bidx.com/ga/planholders?contid=B3CBA2102167-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2102167-0 12% 22
January 2022
B3CBA2101559-2 https://www.bidx.com/ga/proposal?contid=B3CBA2101559-2 https://www.bidx.com/ga/planholders?contid=B3CBA2101559-2 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2101559-2 9% 20
B3CBA2200993-0 https://www.bidx.com/ga/proposal?contid=B3CBA2102167-0 https://www.bidx.com/ga/planholders?contid=B3CBA2200993-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2200993-0 11% 24
B3CBA2200982-0 https://www.bidx.com/ga/proposal?contid=B3CBA2200982-0 https://www.bidx.com/ga/planholders?contid=B3CBA2200982-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2200982-0 12% 25
February 2022
B3CBA2201210-0 https://www.bidx.com/ga/proposal?contid=B3CBA2201210-0 https://www.bidx.com/ga/planholders?contid=B3CBA2201210-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2201210-0 9% 15
B3CBA2201214-0 https://www.bidx.com/ga/proposal?contid=B3CBA2201214-0 https://www.bidx.com/ga/planholders?contid=B3CBA2201214-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2201214-0 11% 16
March 2022
B3CBA2201352-0 https://www.bidx.com/ga/proposal?contid=B3CBA2201352-0 https://www.bidx.com/ga/planholders?contid=B3CBA2201352-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2201352-0 11% 27
May 2022
B3CBA2201893-0 https://www.bidx.com/ga/proposal?contid=B3CBA2201893-0 https://www.bidx.com/ga/planholders?contid=B3CBA2201893-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2201893-0 11% 26
B3CBA2201791-0 https://www.bidx.com/ga/proposal?contid=B3CBA2201791-0 https://www.bidx.com/ga/planholders?contid=B3CBA2201791-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2201791-0 13% 27
June 2022
B3CBA2202013-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202013-0 https://www.bidx.com/ga/planholders?contid=B3CBA2202013-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2202013-0 11% 47
B3CBA2202070-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202070-0 https://www.bidx.com/ga/planholders?contid=B3CBA2202070-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2202070-0 10% 50
B3CBA2202035-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202035-0 https://www.bidx.com/ga/planholders?contid=B3CBA2202035-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2202035-0 9% 51
B3CBA2202008-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202008-0 https://www.bidx.com/ga/planholders?contid=B3CBA2202008-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2202008-0 8% 52
B3CBA2202060-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202060-0 https://www.bidx.com/ga/planholders?contid=B3CBA2202060-0 https://www.bidx.com/GADOT/apparentbids/contid/B3CBA2202060-0 10% 54
July 2022
B3CBA2202166-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202166-0 Apparent low bid 11% 15
B3CBA2201985-0 https://www.bidx.com/ga/proposal?contid=B3CBA2201985-0 Apparent low bid 8% 17
B3CBA2202177-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202177-0 Apparent low bid 10% 19
B3CBA2202185-0 https://www.bidx.com/ga/proposal?contid=B3CBA2202185-0 Apparent low bid 14% 21

SVDBE Participation Requirements

To be considered toward the SVDBE participation goal, a firm must possess current certification/registration at the time of bid submission.  To confirm SVDBE status of any firm select the appropriate category below:

Disadvantaged Business Enterprise (DBE)

The entire SVDBE goal may be achieved through the use of firms identified as a GDOT certified DBE at the time of bid submission.  Search the GDOT UCP Directory here to confirm DBE certification:

Veteran Owned Small Business

No more than 50% of the established SVDBE goal may be achieved through the use of firms identified by the U.S. Department of Veteran Affairs as a veteran owned small business (VOSB) or small disabled veteran owned small business (SDVOSB)at the time of the bid submission.  Search the US Department of Veteran Affairs database here to confirm VOSB/SDVOSB certification:

Small Business

No more than 50% of the established SVDBE goal may be achieved through the use of firms identified by the Georgia Department of Administrative Services (DOAS) as a Georgia resident small business.  Search the DOAS database here to confirm registered Georgia resident small business status:

SSFP Projects with SVDBE Goals

SSFP projects have proposal numbers beginning with “B3”

GDOT requires construction contractors, architectural and engineering consultants, and firms providing specialty service for Georgia DOT to be prequalified for the work they are proposing to perform.

Construction Contractors

GDOT Form 478 required for contracts under $2M ; GDOT Forms 477 & 478 required for contracts exceeding $2M

Engineering Contractors

Specialty Contractors

GDOT Disadvantaged Business Enterprise

Application & Process

Veteran-Owned Small Business & Service Disabled Veteran-owned small business Application & Process

Small Business- GA Resident Small Business Registration

Small business registration is part of the sourcing bidder registration in

Team Georgia Market Place

Disadvantaged Business Enterprise (DBE)– The entire SVDBE goal may be achieved through the use of firms identified as a GDOT certified DBE at the time of bid submission.  Search the GDOT UCP Directory here to confirm DBE certification. NOTE: Select Directories, UCP

Veteran Owned Small Business No more than 50% of the established SVDBE goal may be achieved through the use of firms identified by the U.S. Department of Veteran Affairs as a veteran-owned small business (VOSB) or service disabled veteran-owned small business (SDVOSB)at the time of the bid submission.  Search the US Department of Veteran Affairs database here to confirm VOSB/SDVOSB certification:

Small Business – No more than 50% of the established SVDBE goal may be achieved through the use of firms identified by the Georgia Department of Administrative Services (DOAS) as a Georgia resident small business.  Search the DOAS database here to confirm registered Georgia resident small business status:

Construction Contracting Opportunities

Letting proposal Numbers with the prefix “B3” are funded by HB170. Only HB170 funded capital projects with subcontracting opportunities will have an established SVDBE goal.  Capital projects are new construction, expansion, or renovation projects.  Capital projects are not maintenance, routine maintenance, or resurfacing projects.

  1. Go to the desired letting: https://www.bidx.com/ga/lettings
  2. Identify proposals with the prefix “B3”
  3. Select the desired proposal
  4. Once the proposal has been selected, select Proposal under Downloads and view the corresponding Call #
  5. Go to the DBE Goal commitment page to identify the established SVDBE goal (usually page 3 of the GDOT Proposal document ) NOTE: The goal will be reflected as “DBE”; however it is in fact the established SVDBE goal.

Contact GDOT Business Resource Center for questions and to register for training and assistance with pursuing SSFP opportunities.

GDOT Business Resource Center

One West Court Square

Regus Center- Suite 750

Decatur, GA 30030

Phone: 678-420-5500

Website: www.gdotstateprojects.com

Email: GDOTSSFP@mhm-cpa.com